
An AT&T Death Valley site, rebuilt to hold power in 150 mph winds.
A critical comms site running on generators.
The Dumont Dunes site is among the hardest locations to reach in the region — deep sand and grades most 4x4s can't climb, with materials arriving by bulldozer and helicopter. High winds destroyed the original solar array, heavy loads killed the battery system, and for a year an AT&T operator drove out every two days to refuel generators.
A redesigned, storm-rated system.
In 2024 NewGrid's remote-site crew — metal fabricators, welders, field engineers, and PV installers — rebuilt the site: solar arrays engineered to hold through 150 mph winds, modern power conversion, and supercapacitor energy storage.
- 30 kW solar
- 120 kWh supercapacitor energy storage
- Vertiv NetSure rectifiers and solar controllers
- -48VDC power distribution
Reliable coverage, back on solar.
Since commissioning in October 2024, the generators run only through poor weather.
Tell us what you need to power.
Send us your location, your loads, and what the site has to do. We'll tell you what's realistic before you spend anything.
